K Smarthome
Studio

Digital Design Studio

Review status: Customer draft
STANDARD HOMES BY SIZE

Compare exterior, plan and 3D film before you configure

Selecting a model updates the design steps, estimate, programme and plan below.

K Compact
25–45 m² · Studio / 1 bed
3D film
Area25–45 m²
Base range£42k–£78k
Lead time10–14 weeks
Open image & plan
K Essential
55–70 m² · 1–2 beds
3D film
Area55–70 m²
Base range£95k–£155k
Lead time12–16 weeks
K Family
70–120 m² · 2–4 beds
3D film
Area70–120 m²
Base range£180k–£380k
Lead time16–22 weeks
Open image & plan
K Premium
120–250 m² · 3–6 beds
3D film
Area120–250 m²
Base range£420k–£1.2m
Lead time22–34 weeks
Open image & plan

Exterior images, plans and 3D films are concept material. Contract drawings, structure, product specification and price follow site survey, approvals, engineering and supplier confirmation.

Country & site

21-STAGE ESTIMATE & OVERLAPPED PROGRAMME

From approvals to move-in and aftercare

Choose an option for each stage to update the estimated cost, duration, programme, floor plan and 3D exterior preview.

Early planning · not a final quotation
Factory price estimate
£65,000

Home modules and factory-fitted items

Delivered & installed estimate
£95,000

Shipping, customs, crane and assembly

Project completion estimate
£125,000

Professional, approval and site-cost estimate

Included

Selected model, displayed stage allowances and options

Excluded

Land, finance interest, legal/tax costs and abnormal site conditions

To be confirmed

VAT, CIL/S106, duty/FX, utilities, warranty and lender acceptance

#StageSelected optionEstimateDurationProgrammeTimeline
01Brief, budget & site£2,5002 wkW1–2
02Title & rights reviewCalculated from the base model£1,2503 wkW1–3
03Surveys, ground & accessCalculated from the base model£3,7505 wkW2–6
04Planning strategy & approvalCalculated from the base model£4,37514 wkW5–18
05CIL, S106 & Party WallCalculated from the base model£3,12510 wkW8–17
06Model & concept design£5,0006 wkW3–8
07Structure, fire, energy & MEP£7,5009 wkW7–15
08Building Control & warranty reviewCalculated from the base model£3,12510 wkW10–19
09Price, contract, insurance & financeCalculated from the base model£1,8754 wkW17–20
10Factory order & procurement£8,7504 wkW20–23
11Factory build, appliances & smart systems£36,25012 wkW23–34
12Factory QA & releaseCalculated from the base model£1,8752 wkW34–35
13Packing, shipping & marine insuranceCalculated from the base model£7,5006 wkW36–41
14Customs, port & UK transportCalculated from the base model£4,3753 wkW41–43
15Site start, foundations & utilities£13,75012 wkW20–31
16Crane, assembly & connectionsCalculated from the base model£7,5004 wkW44–47
17Fit-out, externals & landscapingCalculated from the base model£6,8757 wkW47–53
18Testing, commissioning & energy checksCalculated from the base model£1,8753 wkW53–55
19Building Control completionCalculated from the base model£1,2503 wkW55–57
20Warranty, registration & mortgageCalculated from the base model£1,2504 wkW56–59
21Move-in, defects & aftercareCalculated from the base model£1,2508 wkW59–66
TOTAL ESTIMATE£125,00066 weeksVAT, land, finance costs and local taxes require confirmation

Cumulative order programme

Month 1Month 2Month 3Month 4Month 5Month 6Month 7Month 8Month 9Month 10Month 11Month 12Month 13Month 14Month 15Month 16Month 17
Brief, budget & site
Title & rights review
Surveys, ground & access
Planning strategy & approval
CIL, S106 & Party Wall
Model & concept design
Structure, fire, energy & MEP
Building Control & warranty review
Price, contract, insurance & finance
Factory order & procurement
Factory build, appliances & smart systems
Factory QA & release
Packing, shipping & marine insurance
Customs, port & UK transport
Site start, foundations & utilities
Crane, assembly & connections
Fit-out, externals & landscaping
Testing, commissioning & energy checks
Building Control completion
Warranty, registration & mortgage
Move-in, defects & aftercare
Selected floor plan

1-bed lateral

5565
Open planBed 1Bed 2

Concept plan only; professional drawings follow survey, engineering and approvals.

K20 Essential 3D exterior preview
3D EXTERIOR VIEW

K20 Essential

Cementitious cladding · 1-bed lateral

PHASE 2 · SALES READINESS

Packages, site triage, consultation and PDF summary

These results support an initial consultation and are not a contract quote, planning decision, survey, engineering or financial advice.

Option packages

Completion estimate with selected packages£125,000

Site suitability pre-check

Is ownership or a right to acquire the site confirmed?
Is residential use or planning pre-review available?
Can large trucks and a crane access the site?
Are ground, flood and slope risks low or surveyed?
Are electricity, water and drainage capacity known?
Have boundary, Party Wall and neighbour constraints been checked?
Amber · more information needed
Formal conclusions require site investigation and professional/regulator review.

Consultation and estimate summary

ReferenceKSH-DRAFT-K20ESSEN
ModelK20 Essential · 55–65 m²
Programme66 weeks
Estimate£125,000
Email consultation request

Drafts remain in this browser only. Use the email button to send the request to the company.

PHASE 3 · ORDER READINESS

One control record for supply, approvals, payments and changes

Prices, products, suppliers and warranties remain pending or conditional until supported by evidence. This is an order-readiness control, not a contract, regulatory approval or finance approval.

Supplier, SKU and quotation evidence register

PackageSupplierSKU / IDRequired evidenceStatus
Factory homeManufacturer to be appointedMODEL / REV / MODULESSigned quotation, drawings, specification, QA plan
pending
Appliances & smartApproved distributor requiredBrand / model / UK SKUUK conformity, warranty and commissioning terms
pending
Energy systemsMCS-certified installer requiredSystem design / capacityMCS scope, DNO position and performance design
conditional
Freight & customsFreight forwarder to be appointedIncoterm / HS code / routeFreight quote, cargo cover, tariff and landed-cost check
pending
Foundations & installationUK principal contractor requiredSite-specific works packageSurvey, design, RAMS, programme and fixed-scope quote
pending

Once appointed, record supply, installation, logistics, VAT, margin, quote validity and warranty for every item.

Approval, warranty and lender gates

0/5 verified
Planning and site principle
Planning consultant / LPA
pending
Building Control design review
Building Control approver
pending
10-year structural warranty pre-acceptance
Warranty provider
pending
MMC mortgage lender acceptance
Broker / proposed lender
pending
Construction, marine and PI insurance
Broker / project team
pending
Before factory order or non-refundable production payment, verify project-specific written evidence and contractual conditions precedent.

Milestone payment plan

%MilestoneAllowancePayment gate
5%Reservation and feasibility£6,250Scope, refund terms and client approval
10%Design and approvals£12,500Design appointment, surveys and pre-submission approval
25%Factory order£31,250Planning route, building control/warranty review and frozen specification
25%Mid-production£31,250Factory QA report, evidence and inspection approval
15%Release for shipment£18,750FAT, insurance, shipping documents and site readiness
15%UK installation£18,750Customs, delivery, installation inspection and change control
5%Completion and retention£6,250Completion, warranty registration, O&M file and defects list
100%Revised approved total£125,000KSH-DRAFT-K20ESSEN

Change-order control

No change orders recorded. Draft changes do not alter the total.

Production use should centrally record change number, drawing/spec revision, cost/programme effect, approval dates and signatures.

PHASE 4 · DIGITAL DELIVERY

One verified record from design to aftercare

Role workspaces connect BIM handover, approvals, QA and operational performance to one reference. Entries are a browser demonstration; central storage, binding e-signature and meter APIs require appointed providers.

IFC / RVT / COBie · not connected
Concept viewer · not approved BIM

Common data environment readiness

KSH-DRAFT-K20ESSEN · customer

Model owner and suitability
Pending
Drawing and specification revision
Pending
Clash and issue history
Pending
COBie asset handover
Pending
Apply least-privilege access by role and audit every approval, change and download by user, time and revision.
Pricing is an early estimate based on the model midpoint and selected options.
Stages are shown sequentially; some work may overlap in delivery.
Site, planning, building control, customs and utilities must be verified.
Plans and images are concept previews, not contract drawings.