Smart Retrofit
K Retrofit
Fabric, systems and smart upgrades for existing homes.
40–200 m² 1–5 bed 6–12 wk lead 2–8 wk install
Layouts
Indicative floor plan
Schematic — not to scale40–200 m²
- Fabric-first package
- Systems package
- Whole-house deep retrofit
Suitability
Intended use
Existing dwelling retrofit
Materials
Exterior options
External wall insulation + render
Timber cladding overlay
Retain existing
Specification
Base specification
Insulation upgrade |
Airtightness works |
Heat pump swap |
Smart controls retrofit |
Optional
Available upgrade packages
- +Solar PV
- +Battery
- +EV charger
- +MVHR retrofit
Programme
Estimated timeline
01
Design & compliance
~4 weeks
02
Factory production
6–12 weeks
03
Site delivery & install
2–8 weeks
Regulatory note
Building control notification usually required; heritage properties need consent.